- IBEW + NECA outside lineman apprenticeship · Since 1968
Become a Journeyman Lineman.
NEAT runs the outside lineman apprenticeship for 12 IBEW locals and 43 contractors, from Maine to the Eastern Shore of Maryland. Apprentices start with Boot Camp, then work paid on line crews for at least 7,000 hours while completing 18 online units and hands-on classes. The program takes about 3½ years.
Applications open the first Monday of each month at 8:00 a.m. ET. Each area takes 30.
Next window: the first Monday.
Starting pay, as a share of the journeyman rate, up 5% each period
Minimum hours of paid on-the-job training
Approximate length of the program
College semester hours through the American Council on Education
- The work
What outside linemen build
Linemen build and maintain the power system from the ground up: foundations, poles and towers, overhead and underground lines, substations, street lights and traffic signals. Apprentices learn all of it, on all kinds of terrain and in all kinds of weather, including work on circuits energized from 110 volts to 34,500 volts and higher.
Climb
Wood poles up to 125 ft, steel poles up to 200 ft and steel towers up to 500 ft.
Dig & set
Holes for poles, anchors and foundations, trenches for underground systems and concrete tower foundations.
Erect & string
Assemble and erect towers, then string, splice, sag and deadend wire and cable.
Energized work
Install transformers and replace poles, conductors and insulators without interrupting service.
Substations & lighting
Build substations and install street lights, traffic signals and customer service lines.
Storm repair
Restore electric facilities during storms, when crews are needed most.
Training also covers welding, heavy equipment operation, surveying with a transit, rigging, first aid and CPR.
- How the lineman apprenticeship works
From application to Journeyman Lineman
Every apprentice goes through the same eight steps. The waiting list is ranked by interview score, so the application date does not set your place in line.
Costs to plan for
Aptitude testing fee, paid when you apply
First-year online access and course material
Hand tools for your first job and climbing gear, bought around Boot Camp
Boot Camp weekends. Pay starts when you are placed on a crew.
Apply online
The application opens the first Monday of each month at 8:00 a.m. ET and closes when your area reaches 30. Upload your driver’s license, CDL and any DD-214, line school transcripts or certifications.
Aptitude test
Math and reading comprehension, given once a month and scored 0 to 9 by an outside company. A 3 passes. Below 3, you wait six months to reapply.
Committee interview
Power line contractors and local union members each score you from 0 to 100. Send your resume and certifications to the NEAT office well before the interview so they can be reviewed.
Waiting list
You are ranked by your average interview score on a confidential list for up to two years. When your area needs apprentices, NEAT calls a group of 20 to 30 from the top.
Screening
When called, you have 24 hours to respond and complete a DOT physical and drug test, followed by criminal background and motor vehicle record checks.
Boot Camp
6 to 8 consecutive weekends. The first 40 hours are climbing, ending in a climbing test you must pass. Then OSHA T&D, Rigger Signalperson and knot tying, plus your NEAT email account and online course material.
Go to work
NEAT places you with a contractor as soon as possible. Recently, most apprentices have started before Boot Camp ended or shortly after. Pay starts at 60% of the journeyman rate.
Journeyman Lineman
Complete 7,000 or more hours of OJT and all 18 units and tests, then take the Journeyman Lineman Exam through your Area Coordinator. The IBEW accepts graduates as Journeyman Linemen.
- During the lineman apprenticeship
Field, class and online
The three run side by side for the full 3½ years, under the national curriculum from the National Joint Apprenticeship and Training Committee.
- 7,000+ hours
On-the-job training
Paid work on contractor crews under Journey Level Workers. Your monthly report of hours, type of work and a signed performance evaluation is due by the 20th of the following month.
- Every 4 to 6 weeks
Practical training classes
In person, usually on Saturdays with some Sundays, 8 to 10 hours, in classrooms and de-energized outdoor yards. Schedules come from your area’s training sub-committee.
- 18 units
Online coursework
Each unit has 16 chapters of 15 to 50 questions. Pass every chapter and each supervised unit test with a 70 or better, at your own pace within set deadlines.
Graduates can receive 27 semester hours of college credit through the American Council on Education. NEAT compares the apprenticeship to the technical program of a two-year community college.
- Lineman apprenticeship pay & benefits
Paid from your first day on a crew
Apprentices start at 60% of their local’s journeyman rate and move up 5% each period through the 7th, then to full journeyman scale.
- Health, dental and vision plans fully funded by the contractor. You pay normal co-pays.
- Contractor retirement contributions of just under $13 to over $15 per hour worked, depending on your home local, into a pension, annuity, 401(k) or a mix.
- IBEW membership that travels with you wherever there is work.
Hourly rates by local
| Local | 1st period | 7th period | Journeyman |
|---|---|---|---|
| 3 | $33.60 | $50.40 | $56.00 |
| 42 | $31.20 | $46.80 | $52.00 |
| 104 North ME, NH, VT | $25.00 | $37.50 | $41.67 |
| 104 South MA, RI | $30.12 | $45.18 | $50.20 |
| 126 | $33.76 | $50.63 | $56.26 |
| New Jersey | $33.50 | $50.25 | $55.83 |
| 1049 | $36.73 | $55.09 | $61.21 |
| 1249 | $32.82 | $49.23 | $54.70 |
| 1319 | $36.43 | $54.65 | $60.72 |
Wage rates as posted on NEAT’s pay schedule. The 2nd through 6th periods fall in between at 65% to 85%. Full schedule
- Before you apply
Lineman apprenticeship requirements
The work is physically and mentally demanding, done at heights, in confined spaces and around high voltage, where mistakes can cause severe injury or death. Every applicant needs to:
- Be at least 18 years old
- Hold a valid driver's license
- Hold a Class A or B CDL with air brake endorsement, plus an "M" endorsement if you live in New York
- Be physically fit and able to learn to climb proficiently
- Be willing to work anywhere in your local's jurisdiction and NEAT's 10-state jurisdiction
- Have internet access for online coursework
Documents decide eligibility
A missing document or an expired license, CDL or CDL permit makes an application ineligible, and it cannot move forward. Files can be PDF, Word, JPG, PNG, HEIC or TIF. NEAT sends all correspondence by email, so check all of your inboxes.
- Video
Inside the lineman apprenticeship
Filmed at the September 2026 Boot Camp and on location in Barrington and Epping, New Hampshire.
- About NEAT
Run jointly by the IBEW and NECA since 1968
NEAT was created in 1968 by the International Brotherhood of Electrical Workers and the National Electrical Contractors Association to train Union Journeyman Linemen for the outside construction industry. Its Joint Apprenticeship and Training Committee includes representatives of the IBEW and the Northeastern Line Constructors Chapter of NECA.
The lineman apprenticeship follows the national program guided by the electrical training ALLIANCE, is registered with and monitored by the U.S. Department of Labor, and also runs upgrade training for IBEW Journey Level Workers.
Affiliated IBEW locals
Affiliated contractors
States in NEAT’s jurisdiction
New apprentices added each year
Jurisdiction
- Connecticut
- Delaware
- Maine
- Maryland (Eastern Shore)
- Massachusetts
- New Hampshire
- New Jersey
- New York
- Pennsylvania
- Rhode Island
- Vermont
Affiliated IBEW locals
- Local42East Windsor, CT
- Local102Parsippany, NJ
- Local104Barrington, NH · Lewiston, ME · Mansfield, MA
- Local126Collegeville, PA · Pittsburgh, PA · Houtzdale, PA · Bridgeville, DE
- Local164Paramus, NJ
- Local269Trenton, NJ
- Local351Hammonton, NJ
- Local400Wall, NJ
- Local456North Brunswick, NJ
- Local1049Long Island, NY
- Local1249Cicero, NY
- Local1319Wilkes-Barre, PA
Affiliated contractors
- Bancker Electric
- Carr & Duff
- Central Connecticut Cable Co.
- D & D Power
- D & M Utility Construction
- Edison Power Constructors
- E-J Electric Installation Co.
- Eldor Contracting
- Elecnor Hawkeye
- Evans Line Construction
- Ferguson Electric Construction
- Grattan Line Construction
- Harlan Electric
- Haugland Energy Group
- Hellman Electric
- Hooper Corporation
- I.B. Abel
- JBL Electric
- Johnson Electrical Construction
- Mass Electric Construction Co.
- Matrix NAC
- McDonough Electric
- McPhee Electric
- Michels Power
- Miller Brothers Electrical Contractors
- MJ Electric
- The L.E. Myers Co.
- New River Electrical
- Newville Electric Services
- Northline Utilities
- O’Connell Electric
- PAR Electrical Contractors
- Prysmian Construction Services
- Richardson-Wayland Electrical
- Riggs Distler & Company
- Schupp’s Line Construction
- Syracuse Merit Electric
- Tel-Power
- Three Phase Line Construction
- USNE
- UTEC Constructors
- Valiant Energy Service
- Welsbach Electric
Current apprentices
Finished all 18 units and tests? Contact your Area Coordinator to schedule the Journeyman Lineman Exam.
- Next application window
Applications open the first Monday of the month at 8:00 a.m. ET.
Each area takes 30 applications a month, and the window closes when it fills. Have your license, CDL and documents ready before you start.